To establish a straight reference line for installing the first course of siding, you should measure _____
a. at four points on each side of the building
b. down from the eaves
c. up from the ground
d. along the top of the foundation
b
You might also like to view...
Depending on the complexity of the project, dimensions may be placed on the floor plan or framing plan, but not on both.
Answer the following statement true (T) or false (F)
If none of the detectors in a level measurement system are in contact with the measurement material, the system is described as __________.
A. displacing B. inferential C. noninvasive D. resistive
One common method of determining when the ice bin is full is:
A) When the ice bin is full, the evaporator gets too warm and will no longer chill to make ice. B) An ice level probe. C) A strain gauge on the bottom of the bin. D) When the ice bin is full, there is no room for water in the reservoir, so the ice machine shuts down.
Single-phase transformers connected in three-phase configurations are called three-phase transformer ____.
a. secondaries b. primaries c. banks d. cores