Solve the problem.One conveyor belt can move 1000 boxes in 9 minutes. Another can move 1000 boxes in 11 minutes. If another conveyor belt is added and all three are used, the boxes are moved in 3 minutes. How long would it take the third conveyor belt alone to do the same job?

A.  minute
B.  minute
C. 7 minutes
D. 1 minutes


Answer: C

Mathematics

You might also like to view...

Factor the trinomial completely. If the trinomial cannot be factored, say it is prime.m2 + mn - 56n2

A. (m + 8n)(m - 7n) B. (m + 8n)(m + 7n) C. (m - 8n)(m + 7n) D. (m - 8n)(m - 7n)

Mathematics

Write sigma notation. +  +  +   +   

A.
B.
C.
D.

Mathematics

Multiply.(70,046.91)(0.00001)

A. 7004.691 B. 0.7004691 C. 7.004691 D. 700.4691

Mathematics

Perform the indicated operation. + 7b + 5

A. 252ab
B. 54ab2
C. 252b
D. 54b

Mathematics