Why must the estimator consider how the concrete will be transported to the job site?
What will be an ideal response?
The estimator must consider how the concrete will be transported to the jobsite to determine if ready-mixed concrete is available or if they will have to arrange for job-mixed concrete.
You might also like to view...
Cuando use equipos de corte oxĂgas, use zapatos o botas de seguridad con una altura de por lo menos _____ pulgadas.
a. cuatro b. cinco c. seis d. ocho
When an idle speed balance (ISB) test is run on a DD-Series engine with ACRS and one injector displays a high positive value, which of the following is the likely cause?
A. actuator malfunction B. restricted nozzle C. restricted high pressure line to the injector D. any of the above conditions
The caliper dust boot may need to be pried out with a(n) ________
A) C-clamp B) Screwdriver C) Air chisel D) Special tool
Pulmonary arteries carry the oxygenated blood from the lungs back to the heart's left atrium.
Answer the following statement true (T) or false (F)