When installing an exposed grid ceiling system, the first component to be installed is the _____
a. main runners
b. hanger inserts and wires
c. cross runners (tees)
d. wall angle
d
You might also like to view...
Explain how you determine which renovation method to use on a lawn that has
failed.
What will be an ideal response?Most mission statements are between 120 and 180 words.
Answer the following statement true (T) or false (F)
A ____________________ is a daily or periodic account of what you did when conducting your research
a. Research report c. Log book b. Project display d. Date book
A low pressure control has a "high event" and a "differential" setting. The technician wants the system to turn on at 28 psig and shut down at 2 psig. What would be the proper settings?
A. high event: 28 psig, differential: 2 psig B. high event: 2 psig, differential: 2 psig C. high event: 28 psig, differential: 26 psig D. high event: 2 psig, differential: 28 psig