What fastener needs to be installed prior to concrete placement?

a. Concrete screw
b. Double expansion anchor
c. Snap-off anchor
d. Anchor bolt


Answer: D

Trades & Technology

You might also like to view...

Gerbils are often very noisy animals

Indicate whether the statement is true or false

Trades & Technology

Almost all of the food we eat is sold fresh

Indicate whether the statement is true or false

Trades & Technology

Which one of the following statements on SQO and SQC sequencer instructions is NOT true?

A) Use a register word in the mask location to change the mask pattern under program control. B) In the mask bit pattern, a 1 bit passes values, and a 0 inhibits the data flow and puts a 0 in the data result. C) SQO and SQC sequencer instructions must use an indexed file indicator (#) for the file destinations. D) Indicate word radix by placing an h behind the parameter value to indicate a hexadecimal number; a d for decimal, and no indicator for binary.

Trades & Technology

Using a 10x probe, one complete cycle of a sine wave spans 1.7 blocks when the Sec/Div switch is set to 5 sec. The frequency of this sine wave is ____.

A. 8.5 Hz B. 85 Hz C. 117.65 mHz D. 1.18 Hz

Trades & Technology