Another name for the final detailed plans is
A. working drawings
B. plot plans
C. plans and specifications
D. site plans
Answer: A
You might also like to view...
The minimum required width of the air space between a brick veneer and a CMU backup wall is
A) 1 in. B) 1-1/2 in. C) 2 in. D) 3 in. E) none of the above.
What is the term Caterpillar use to describe the pilot injection feature of later model HEUIs?
A. IPR B. IAP C. ACERT D. PRIME
Assume that the building in Appendix C has all exterior walls of 4-inch brick with 8-inch concrete block backup. Estimate the masonry, mortar, and accessories required. Note: Brick begins at elevation 104'4".
What will be an ideal response?
The term free-roaming pets includes
A. Stray animals B. Uncontrolled animals C. Ownerless and feral animals D. Unwanted pets E. All of the above