Another name for the final detailed plans is

A. working drawings
B. plot plans
C. plans and specifications
D. site plans


Answer: A

Trades & Technology

You might also like to view...

The minimum required width of the air space between a brick veneer and a CMU backup wall is

A) 1 in. B) 1-1/2 in. C) 2 in. D) 3 in. E) none of the above.

Trades & Technology

What is the term Caterpillar use to describe the pilot injection feature of later model HEUIs?

A. IPR B. IAP C. ACERT D. PRIME

Trades & Technology

Assume that the building in Appendix C has all exterior walls of 4-inch brick with 8-inch concrete block backup. Estimate the masonry, mortar, and accessories required. Note: Brick begins at elevation 104'4".

What will be an ideal response?

Trades & Technology

The term free-roaming pets includes

A. Stray animals B. Uncontrolled animals C. Ownerless and feral animals D. Unwanted pets E. All of the above

Trades & Technology