The Wellbuilt Company produces two types of wood chippers, economy and deluxe. The deluxe model requires 4 hours to assemble and 0.5 hour to paint, and the economy model requires 2 hours to assemble and 1 hour to paint. The maximum number of assembly hours available is 22 per day, and the maximum number of painting hours available is 8 per day. Let x represent the number of deluxe models and y represent the number of economy models. Write the system of inequalities that describes the constraints on the number of each type of wood chipper produced.
?
A.
B.
C.
D.
E.
Answer: C
Mathematics
You might also like to view...
Assume the region is part of a vertical side of a tank with water (? = 62.4 6 6
A. 40,435.20 lb B. 6739.20 lb C. 80,870.40 lb D. 20,217.60 lb
Mathematics
Use Chebyshev's theorem to solve the problem.In a certain distribution of numbers, the mean is 50 and the standard deviation is 6. What can you say about the percentage of numbers that are less than 20 or more than 80?
A. at most 4% B. at most 96% C. at least 96% D. at most 20%
Mathematics
Evaluate the expression for the given replacement values.xy, for x = 4 and y = 4
A. 3 B. 16 C. 44 D. 256
Mathematics
Solve the problem.Julie rode her bicycle 41 km in one afternoon. How many m did she ride?
A. 0.41 m B. 41,000 m C. 4100 m D. 0.041 m
Mathematics