A technician performs five separate service procedures with respective flat rate times of: 0.6 hr, 0.2 hr, 1.9 hr, 3.4 hr, and 2.6 hr. What was the total decimal equivalent time spent on these procedures?

Fill in the blank(s) with the appropriate word(s).


8.7 hr

Trades & Technology

You might also like to view...

____ specifications outline material selection and the construction operation process to be followed in providing construction materials and practices.

A. Reference standard B. Process C. Material D. Common

Trades & Technology

The color of the wiring for ground on household electrical wiring is _____.

What will be an ideal response?

Trades & Technology

A piston-cylinder device initially contains 100 kg of liquid water at T = 353.15 K and P = 0.1 MPa. The device is isobarically heated, expanding against an external pressure of 0.1 MPa, until exactly 12 % of the water has vaporized, with the rest remaining in the liquid phase. How much heat was added?

A. 2. MJ B. 35.5 MJ C. 7.7 MJ D. 37.5 MJ E. Insufficient information to solve

Trades & Technology

In the accompanying figure, the item numbered 2 represents ____.

A. computer-output B. standard-output C. plotted-output D. digital-output

Trades & Technology