Write the e-system obtained via slack variables for the linear programming problem.MaximizeP = 3x1 + 5x2subject to:9x1 + 2x2 ? 30 x1 + 8x2 ? 40with:x1 ? 0, x2 ? 0
A. 9x1 + 2x2 = s1 + 30
x1 + 8x2 = s2 + 40
B. 9x1 + 2x2 + s1 = 30
x1 + 8x2 + s1 = 40
C. 9x1 + 2x2 + s1 ? 30
x1 + 8x2 + s2 ? 40
D. 9x1 + 2x2 + s1 = 30
x1 + 8x2 + s2 = 40
Answer: D
You might also like to view...
Find the area of the specified region.Inside the limacon r = 7 + 6 sin ?
A. 67? B. 134? - 84 C. 134? D. 67? + 84
Two sides and an angle are given. Determine whether the given information results in one triangle, two triangles, or no triangle at all. Solve any triangle(s) that results.a = 23, b = 16, B = 20°
A. one triangle A = 29.45°, C = 130.55°, c = 35.55 B. one triangle A = 150.55°, C = 9.45°, c = 7.68 C. two triangles A1 = 29.45°, C1 = 130.55°, c1 = 35.55 or A2 = 150.55°, C2 = 9.45°, c2 = 7.68 D. no triangle
Evaluate the integral.
Solve the problem.Find how long it will take for $1100 invested at per year compounded daily to triple in value. Find the answer to the nearest year.
A. 0 years B. 23 years C. 3,049,422 years D. 30,692 years