Materials specified on a roof plan include the roofing material, the type of underlayment, overhangs, drainage materials such as gutters and downspouts, vents and their location, and any major roof penetrations such as skylights and chimneys.

Answer the following statement true (T) or false (F)


True

Trades & Technology

You might also like to view...

Which of the following is one of the major elements included in an Emergency Action Plan?

A) Evacuation procedure B) Procedures for employees who are required to stay behind C) A procedure to account for all employees after evacuation D) All of the above

Trades & Technology

How often should the refrigeration oil in a compressor be changed?

What will be an ideal response?

Trades & Technology

What flashing valleys on roofs that are covered with wood shakes or shingles, #30 underlayment and a sheet of ________ gauge galvanized metal should be used

A) 26 B) 18 C) 30 D) 12

Trades & Technology

____ control is a planned strategy for shedding (e.g., temporarily turning off) one or more loads when a specific condition is detected in the system.

a. Error b. Priority c. Systemic d. Conditional

Trades & Technology