What three main pieces of information are needed by the drafter in order to construct the fabrication details for a job?

What will be an ideal response?


In order to construct the fabrication details for a job, the drafter must have:
•  the framing plan(s) for the job
•  the sections
•  the connection details

Trades & Technology

You might also like to view...

To check the slack adjusters on scam drum brakes you should first

a. park on level ground and drain off the air pressure. b. park on level ground, chock the wheels, and release the parking brakes. c. stop on level ground and apply the parking brakes.

Trades & Technology

Technician A says that some intake manifolds are plastic. Technician B says that some intake manifolds are constructed in two parts or sections: upper and lower. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B

Trades & Technology

The hexadecimal equivalent of decimal 88 is ________

A) 5116 B) 5516 C) 5816 D) 6816

Trades & Technology

Fillets and Rounds may be produced by machining, casting, or forging.

Answer the following statement true (T) or false (F)

Trades & Technology