Technician A says when testing for maximum alternator output, the battery must be loaded to force the alternator to produce its maximum output. Technician B says after disassembly, all alternator internal components should be tested using an ammeter. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians D) Neither technician


A

Trades & Technology

You might also like to view...

Describe the two classifications of aluminum alloys.

What will be an ideal response?

Trades & Technology

Boilers classified as low-pressure steam boilers have a maximum operating pressure of _____.

a. 5 psi b. 15 psi c. 50 psi d. 100 psi

Trades & Technology

In AFC systems, water management depends to a great extent on whether the electrolyte is ____________________ or not.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Describe the normal charging method of battery charging.

What will be an ideal response?

Trades & Technology