The CFS framing for an exterior non-load-bearing wall used as backup for exterior cladding can either be a bypass framing or an infill framing. The bypass framing can be used for

A) up to a one -story building.
B) up to a two-story building.
C) up to a three-story building.
D) up to a four-story building.
E) up to any number of stories.


B) up to a two-story building.

Trades & Technology

You might also like to view...

_____ are reproduced from original drawings by a process that may cause a small amount of shrinkage.

A. Blueprints B. Working drawings C. Scaled plans D. Floor plans

Trades & Technology

The vertical datum used to establish elevations on the map is the

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

If two sides of a triangular lot are 90 feet and 120 feet and meet at a 90-degree angle, the length of the third side of the lot is _____.

a. 120 feet b. 150 feet c. 180 feet d. 240 feet

Trades & Technology

Oil pressure safety controls measure the difference in pressure between the ____.

A. oil pump inlet and discharge pressures B. oil pump discharge pressure and compressor head pressure C. oil pump inlet pressure and compressor suction pressure D. oil pump discharge pressure and compressor crankcase pressure

Trades & Technology