In broad terms, what are the requirements of HAZWOPER?
What will be an ideal response?
The standard covering hazardous waste operations in construction is 29 CFR 1926.65 and is often referred to as HAZWOPER. HAZWOPER gives organizations two options for responding to a chemical spill. The first is to evacuate all employees in the event of a spill and to call in professional emergency response personnel. Employers who use this option must have an emergency action plan (EAP) in place. The second option is to respond internally. Employers using this must have an emergency response plan in place.
You might also like to view...
When selecting a subcontractor for the different pieces of work, the contractor must balance scopes and be able to compare quote to quote, known as scope alignment.
Answer the following statement true (T) or false (F)
What option would a technician have to increase NPSH available when it is too low?
a. Decease the pressure above the liquid b. Decrease the liquid level c. Increase the pressure above the liquid d. Increase the liquid temperature
NEC Article 376 contains definitions for _____.
a. bus bracing b. metal wireways c. panelboards d. clearances
Waterfowl habitat can be enhanced by _____
a. water-retaining dikes b. terraces c. dams d. all the above