A section of the boiler utilized to preheat feed water before it enters the main boiler system.

a. convection section
b. economizer section
c. radiant tube section
d. shockbank


Answer: B

Trades & Technology

You might also like to view...

If the SAI angle is 12 degrees, and the camber is 1 degree +, the included angle is:

A. 10 degrees B. 11 degrees C. 13 degrees D. 14 degrees

Trades & Technology

Where the grounding electrode conductor or bonding jumper connects to a single or multiple rod, pipe, or plate electrode(s) or any combination thereof, or does not extend on to other types of electrodes that require a larger size conductor, the grounding electrode conductor shall not be required to be larger than ____.

A. 2 AWG copper wire or 4 AWG aluminum B. 4 AWG copper wire or 6 AWG aluminum C. 6 AWG copper wire or 4 AWG aluminum D. 6 AWG copper wire or 8 AWG aluminum

Trades & Technology

List operational checks to make during an air conditioning planned maintenance service call

What will be an ideal response?

Trades & Technology

A circuit that can be turned on with one push button and turned off with another can be constructed with ____ gate(s).

A. an AND and an OR B. two AND C. an INVERTER and a NAND D. two NAND

Trades & Technology