Safety and quality assurance are part of the _____ phase.
a. pre-construction
b. closeout
c. bidding
d. construction
d. construction
You might also like to view...
Match each term with the correct statement below.
A. Applies a false load on the evaporator when there is no load B. Usually installed in the heat reclaim pump-out or bleed line to prevent migration of refrigerant to the coldest location C. Tremendous forces that can cause refrigerant lines and values to rupture D. When air is used for controls E. Removes refrigerant from the heat reclaim coil when it is not being used
A ____ gap may require ____.
A. narrow, more penetration B. narrow, less penetration C. wide, more penetration D. narrow, forehand welding
What was the purpose of the Arsenal in Venice?
a. to stockpile gunpowder and weapons for the city’s protection b. to house the city’s mercenary army c. to equip and repair the republic’s warships and merchant vessels d. to mobilize a large number of skilled workers and galley slaves
NOR gates can be used to construct AND gates
Indicate whether the statement is true or false