La primera respuesta frente a un incendio es _____.
a. bajar la carga
b. asegurar la grúa
c. detener el funcionamiento
de la grúa
d. extinguir el fuego
Answer: C
You might also like to view...
?Most land-related plans such as construction site plans are drawn using the ____ scale.
A. drafter's B. ?civil engineer's C. ?mechanical D. ?architect's
Repeat Problem 8-5 for the following phasing systems: (a) Four-phase with separate phases for left turns (b) Four-phase with separate phase for each approach
What will be an ideal response?
With respect to control systems, participation and Management By Objectives
a. cause employees to resist control. b. are techniques for overcoming resistance to controls. c. are criteria for making a control effective. d. are steps in the control process. e. are actions taken after evaluation control.
All of these are types of snap rings EXCEPT _________
A) External B) E-clip C) Internal D) All of these are snap rings