After reviewing the construction plan for a job and realizing that contact with raw sewage may happen, an operator should be prepared by _____.
a. having a personal respirator available
b. chewing gum to cover the odor of the sewage
c. wearing latex or non-latex gloves if contacting sewage
d. washing his or her hands before reporting to work
c. wearing latex or non-latex gloves if contacting sewage
You might also like to view...
When an engine brake is actuated on a current truck diesel engine, what is the maximum fueling permitted?
A. no fuel B. idle fuel C. high idle fuel D. rated speed fuel
Las reglas obligatorias son:
a. reglas que los electricistas pueden cambiar. b. reglas con la palabra "se permitirá" que sugieren procedimientos de instalación. c. reglas para los conductores únicamente. d. reglas con las palabras "deberá" o "no deberá", que los electricistas deben seguir.
Solve the following equation for the unknown variable: -0.027 = y3.
Fill in the blank(s) with the appropriate word(s).
Use Data Sheet 5. Refer to the figure. If the total run is 60", the offset is 12", with 3" PVC, what is the e-e measurement of L?
Fill in the blank(s) with the appropriate word(s).