Project conception may be top-down hierarchy but:
A) strategic planing is always conceived as a whole.
B) each basic clock should be carefully built from the most insignificant to the most sophisticated.
C) each block must be built prior to system planning.
D) integration and testing must be performed on all system prior to project definition.
B