Zero, Inc. agreed to build Millie a storage building for $8,000. After beginning the project, Zero realized that it could not complete the job and make a profit. Zero demanded $9,500 to complete the building. Millie agreed to pay the $9,500. When the project was complete, Millie tendered $8,000 to Zero for the job. If Zero sues Millie for the remaining $1,500,

A. Zero will win because there was consideration for the additional $1,500.
B. Zero will win because Millie had a preexisting duty to pay any additional amounts.
C. Zero will lose because there was no legal consideration to support the additional $1,500.
D. Zero will lose because the UCC does not require consideration to modify an existing contract.


Answer: C

Business

You might also like to view...

Assume that interest rates on 15-year noncallable Treasury and corporate bonds with different ratings are as follows: T-bond = 7.72%A = 9.64%AAA = 8.72%BBB = 10.18%The differences in rates among these issues were most probably caused primarily by:

A. Tax effects. B. Default risk differences. C. Maturity risk differences. D. Inflation differences. E. Real risk-free rate differences.

Business

The relevant costs for the decision to sell or process further are:

a. the additional processing costs. b. always fixed in nature. c. always variable in nature. d. sunk costs.

Business

Thermo Gas, Inc, and Uno Oil Corporation refine and sell gasoline and other petroleum products. To limit the supply of gas on the market and thereby raise prices, Thermo Gas and Uno Oil agree to buy "excess" supplies from dealers and "dispose" of it. This is

a. a deal that neither restrains trade or harms competition. b. a legal restraint of trade. c. a per se violation of the Sherman Act. d. subject to analysis under the rule of reason.

Business

Which of the following is an open-source operating system designed for mobile devices?

A) iOS B) OS X C) Chrome D) Android E) Apache HTTP

Business