When preparing a crane for assembly of a lattice boom, _____.
a. extra counterweight sections may be required during boom assembly
b. A/D personnel stage counterweights for installation after boom assembly
c. only the rear counterweights are installed
d. retract extendable counterweights during boom assembly
a. extra counterweight sections may be required during boom assembly
You might also like to view...
Technician A says to always use new gaskets when transferring oil pans and valve covers from an old engine to a reman engine. Technician B says it is acceptable to reuse gaskets that are in good condition. Who is correct?
A. Technician A B. Technician B C. Both A and B D. Neither A nor B
Simply spraying a solution to coat the seeds before planting often provides enough of which micronutrient to meet the needs of the crop?
A) Mo B) Mn C) Cu D) Zn E) B
Technician A always uses a special service tool to pulse fuel injectors. Technician B says that the injector for each cylinder should only be flow tested four times without starting the engine. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians D) Neither technician
The equipment grounding conductor for a marina or boatyard is required to be:
1. An insulated conductor 2. The insulation is to be green or green with one or more yellow stripes. 3. Sized from 250.122 but not smaller than 12 AWG. 4. All of the above.