To control resources on a project, a supervisor must have knowledge of each of the following except _____.

a. equipment expenses
b. labor costs
c. insurance rates
d. material prices


c. insurance rates

Trades & Technology

You might also like to view...

The final cleanup expenses include the cost of renting large garbage containers and the cost of constructing and later taking down temporary garbage chutes on the project.

Answer the following statement true (T) or false (F)

Trades & Technology

The actuator motor is controlled by the PCM through what type of circuit?

A) Series-Parallel B) Series C) Parallel D) H-bridge

Trades & Technology

The statement that total current entering a point must equal total current leaving that point best describes _____

A) Ohm?s law B) Coulomb?s total current law C) The Theory of Relativity D) Kirchhoff?s current law

Trades & Technology

The cooling anticipator in a thermostat is usually an adjustable type.

Answer the following statement true (T) or false (F)

Trades & Technology