A linear programming problem has two constraints 2X + 4Y ? 100 and 1X + 8Y ? 100, plus nonnegativity constraints on X and Y. Which of the following statements about its feasible region is TRUE?

A) There are four corner points including (50, 0 ) and (0, 12.5 ).
B) The two corner points are (0, 0 ) and (50, 12.5 ).
C) The graphical origin (0, 0 ) is in the feasible region.
D) The feasible region is triangular in shape, bounded by (50, 0 ), (33.3333, 8.3333 ), and (100, 0 )
E) The feasible region cannot be determined without knowing whether the problem is to be minimized or maximized.


D

Business

You might also like to view...

The supply-side method identifies the effect sponsorship has on consumers' brand knowledge

Indicate whether the statement is true or false

Business

Which of the following limits audience interaction but might be needed when information must be conveyed in an exact manner?

A) Reading from a script B) Memorizing the speech C) Reading from the slide deck D) Speaking from notes E) Improvisational discussions

Business

Which of the following is assumed when considering the linearity feature of linear programming (LP) models?

a. The contribution of decision variables to the objective function is proportional. b. The contribution of each decision variable can be added to obtain the overall usage of a given constraint. c. The contribution of each decision variable can be added to obtain the overall value of the objective function. d. All of the above are features of proportionality in LP.

Business

For a project to be accepted, the ________ may be greater than or less than the firm's WACC, but the ________ must be greater than the hurdle rate

A) IRR; NPV B) hurdle rate; IRR C) MIRR; NPV D) NPV; IRR