A 10% duty cycle indicates that the load is turned on 1/10th of the time.?
Answer the following statement true (T) or false (F)
True
You might also like to view...
Another form of the reset timer is often called a ____ timer. It is used extensively in programming control. Multiple time periods can be controlled by the adjustment of each individual ON and OFF setting.
a. clutch b. multiple-interval c. multiple-contact d. repeat-cycle
The proper method to operate a torque wrench is to:
a. use two hands to pull it b. pull the grip only with a slow steady pull c. pull the grip with a hard fast pull d. pull until it clicks and go an extra 30
What is a floating-point value?
What will be an ideal response?
Providing a short duration injection pulse prior to main injection pulse is referred to as:
A. Pilot injection phase. B. Multi-injection phase. C. Delayed injection phase. D. Injection overlap.