Explain who is responsible and why when there are defective drawings in a construction contract
What will be an ideal response?
For a construction contract to not be slanted against the contractor it should include a statement that absolves the contractor of responsibility for checking the design drawings of the engineer.
You might also like to view...
What was the second step in the evolution of digital programming?
What will be an ideal response?
Under WTO rules:
a. Domestic supports that distort markets are illegal. b. Sanitary and phytosanitary regulations based on sound science are legal. c. A trade concession accorded one member must be accorded all others. d. Tariff rate quotas generally replaced quotas. e. All of the above.
The ____________________ is a simplified version of the schematic diagram. Simplified symbols exhibit a minimum of detail of the component and generally no connections at individual terminals.
Fill in the blank(s) with the appropriate word(s).
In its simplest form, bonding means
A. the same thing as grounding. B. connected to a grounding electrode. C. providing a path for current flow. D. a ground fault.