If during the construction of the building, the building inspector discovers a gross violation of the building code, he or she will generally
A) take the owner to the appropriate court of law.
B) issue a warning to the owner.
C) invite the owner for a meeting.
D) issue arrest warrant against the owner.
E) issue a stop work order to the owner.
E) issue a stop work order to the owner.
You might also like to view...
Two technicians are discussing distributor ignition. Technician A says that the pickup coil or optical sensor in the distributor is used to pulse the ignition module (igniter). Technician B says that some distributor ignition systems use an optical sensor. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians A and B D) Neither technician A nor B
On an R-410A air conditioning system, the refrigerant leaving the ________ is 118 psig, 50°F, 100 percent superheated gas
A) evaporator B) condenser C) metering device D) compressor
How does the Carrier infinity control system differ from traditional low voltage control systems?
What will be an ideal response?
Define climatic conditions and explain how they affect food
What will be an ideal response?