If any equipment problems are noted during the pre-shift inspection, the operator should _____.

a. use the equipment with caution until it can be sent in for service
b. perform a field repair to avoid holding up the schedule
c. make a note of it and proceed with operation
d. notify the supervisor or manager, then lock out and tag the equipment so that it cannot be used


d. notify the supervisor or manager, then lock out and tag the equipment so that it cannot be used

Trades & Technology

You might also like to view...

The _____ Hydro Mobile scaffolding is especially designed for projects 100' and more in height.

A. M series B. F series C. P series D. A series

Trades & Technology

What are the two effects of reducing the voltage applied to the motor?

What will be an ideal response?

Trades & Technology

The most important tool for supervising a high-force cable pull is _____.

a. a crane to lift cable reels b. a sufficient amount of cable c. the correct cable lubricant d. working communications equipment

Trades & Technology

What is the typical hole size for the latch assembly in the edge of the door?

A) 7/8" B) 1 7/8" C) 1 3/8" D) 5/8"

Trades & Technology