Which of the following is NOT true of an MRP record?

A) The number of periods in the record is called the planning horizon.
B) The current time is the beginning of the first period.
C) An item is considered to be available at the end of the time bucket in which it is required.
D) The projected on-hand balance is for the end of the period.
E) The immediate or most current period is called the action bucket.


C

Trades & Technology

You might also like to view...

?A check valve fitted with a calibrated spring designed to prevent the valve from opening until a specific pressure is reached is called a _______________ _______________ valve.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

One of two alternatives will be selected to reduce flood damage in a rural community in central Arizona. The estimates associated with each alternative are available. Use B/C analysis at a discount rate of 8% per year over a 20-year study period to determine which alternative should be selected. For analysis purposes only, assume the flood damage would be prevented in years 3, 9, and 18 of the study period.



What will be an ideal response?

Trades & Technology

Compute the reactions and draw the shear and moment curves for the beam in Figure P9.6. EI is constant.

Trades & Technology

A hidden line is ____.

A. dashed B. thick C. dotted D. straight E. none of the above

Trades & Technology