Mechanical refrigerant recovery equipment must meet specifications established by the 1993 AHRI 740 standard.

Answer the following statement true (T) or false (F)


True

Trades & Technology

You might also like to view...

When transporting long lengths of raceway to the jobsite, _____.

a. flag the ends b. paint the ends orange c. the raceway may be cut to shorter lengths to fit in the truck d. secure the load in the center rather than on both ends

Trades & Technology

Mechanical and physical seed dormancy are both caused by the seed covering being impervious to water

Indicate whether the statement is true or false

Trades & Technology

An injector pressure drop test is being discussed. Technician A always uses a special service tool to pulse fuel injectors. Technician B says that the injector for each cylinder should only be flow tested four times without starting the engine. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians D) Neither technician

Trades & Technology

Parallel-in, parallel-out registers have parallel input and output busses

Indicate whether the statement is true or false

Trades & Technology