Describe the Design-Bid-Build contracting method.

What will be an ideal response?


The owner contracts initially with an architect to define the project scope, perform pre-design services, and produce the construction documents. Once the documents are complete, the project is sent out for proposals to qualified contractors. The contract is usually awarded to the most qualified bidder who submits the lowest cost estimate. The general contractor solicits bids from subcontractors using the same bidding procedure. The project responsibilities are divided among the various team members with whom the owner establishes separate contractual relationships.

Trades & Technology

You might also like to view...

Information about the type and spacing of fasteners along the perimeter and in the field of gypsum board is provided in the _____.

a. project specifications b. fastening schedule c. elevation drawings d. hardware list

Trades & Technology

The ____________________ molecule is shaped like a double helix

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

What type of burner do most modern furnaces use?

A) Drilled B) Slotted C) Inshot D) Ribbon

Trades & Technology

When troubleshooting a hydronic heating system, the technician notices that the circulator pump is running and the burner is firing, but no hot water is flowing through the system. What is the most likely problem?

A. defective circulator pump B. defective room thermostat C. air in the system D. high limit open

Trades & Technology