If a G01 command includes X and Y values, but no value for Z:

A. the movement will not be completed, since a value for each axis must be included
B. the machine will move to the specified X and Y values, and move to Z = 0
C. the movement will be completed, with no change in the Z position
D. rapid movement will be completed, with no change in the Z position


Answer: C

Trades & Technology

You might also like to view...

When the rumen becomes filled with dry or indigestible feed, the condition is called _____

a. constipation c. indigestion b. impaction d. all answers are correct

Trades & Technology

Which of the following was the biggest factor in the decline of Spanish power and influence after the sixteenth century?

a. the high costs of incessant warfare b. a lack of cultural activity c. increased provincial opposition to centralized authority d. loss of trade share to regional rivals

Trades & Technology

Anti-spatter compounds are applied to the _____

a. nozzle b. wire electrode c. pipe or other workpiece d. workpiece clamp

Trades & Technology

Pipe threads are standardized by the A.N.S. A.N.S. stands for ____.

A. All Nominal Standard B. American National Standard C. All New Steel D. Apparent Nominal Standard

Trades & Technology