A ________ assures carpenters, builders, and inspectors that wood materials used meet the minimum structural requirements of the IRC

A) CERT EXT rating B) Grade stamp C) Building standard D) Certification point


B

Trades & Technology

You might also like to view...

IDENTIFY TEST PROCESS SYMBOLS AND DIAGRAMS

Trades & Technology

What is the purpose of a snubber in a seismic design?

A) To minimize vibration by constant contact. B) To stop the equipment as it hits the snubber. C) To hold the equipment in place tightly and prevent movement.

Trades & Technology

When raising a steel stud wall, temporary bracing should be placed every _____.

a. 2' to 3' b. 4' to 5' c. 5' to 6' d. 8' to 12'

Trades & Technology

Of the nutrients needed by most plants, ____ come from soil

a. three b. twenty c. most d. all

Trades & Technology