The term "substantial completion," unless redefined in the Contract Documents, normally means that:
A. the work is almost completed, but final completion will not occur until a later date.
B. the contractor's obligations under the contract have been satisfied even though some minor items of pickup work remain.
C. liquidated damage provisions of the contract still apply until all pickup (punch list) work is completed.
D. the architect or engineer may not process final payment until a certificate of "final completion" is executed.
E. none of the above.
B
You might also like to view...
Most Italian immigrants to the United States between 1880 and 1920 came to escape
A. political oppression. B. famine. C. the political disintegration of their country. D. the military draft. E. the poverty and backwardness of southern Italy.
The Youth Apprenticeship Program is designed for _____ students
a) 11th grade b) 7th and 8th grade c) college d) grade school
Why could it be a problem to start a motor in fast speed mode?
What will be an ideal response?
Problem 1.C4
A 4-kip force P forming an angle ? with the vertical is applied as shown to member ABC, which is supported by a pin and bracket at C and by a cable BD forming an angle ? with the horizontal. (a) Knowing that the ultimate load of the cable is 25 kips, write a computer program to construct a table of the values of the factor of safety of the cable for values of ? and ? from 0 to 45°, using increments in ? and ? corresponding to 0.1 increments in tan ? and tan ?. (b) Check that for any given value of ?, the maximum value of the factor of safety is obtained for ? = 38.66° and explain why. (c) Determine the smallest possible value of the factor of safety for ? = 38.66°, as well as the corresponding value of ?, and explain the result obtained.