Activities following a node
a. can begin as soon as any activity preceding the node has been completed.
b. have an earliest start time equal to the largest of the earliest finish times for all activities entering the node.
c. have a latest start time equal to the largest of the earliest finish times for all activities entering the node.
d. None of these are correct.
b. have an earliest start time equal to the largest of the earliest finish times for all activities entering the node.
You might also like to view...
In the global watch industry, the success of the Swatch brand resulted in a manufacturing renaissance for Switzerland. In the strategic framework known as hypercompetition, Swatch's success is an example of interactions in which arena?
A) cost/quality B) timing and know how C) entry barriers D) deep pockets E) sporting events
Which of the following is a type of exploratory research which refers to a review of available information about a former situation(s) that has some similarities to the present research problem?
A) secondary data analysis B) experience surveys C) case analysis D) projective techniques E) focus group research
The demonstration of equivalence of both the unit of measurement and the constant in the equation between the construct and the items measuring the construct is called ________
A) construct equivalence B) scalar equivalence C) operational equivalence D) linguistic equivalence
A company has two inspectors, each earning a salary of $75,000. One inspector works exclusively on inspecting parts received from outside suppliers, while the other spends 30 percent of her time inspecting parts and 70 percent of her time inspecting final products. How much labor cost should be assigned to the activity, inspecting parts?
A) $100,000 B) $95,000 C) $97,500 D) $96,275 E) $75,000