In dwellings, ground-fault circuit-interrupter protection must be provided for all ____-amp, and 125-volt receptacle outlets installed in bathrooms, garages, crawl spaces, unfinished basements, and locations within 6 ft of wet-bar, utility, or laundry sinks.
a. 15- and 20
b. 20- and 25
c. 25- and 30
d. 30- and 35
a. 15- and 20
You might also like to view...
An asphalt paving crew is used to pave a road 8,000 feet long. The road is 48 feet wide and the paving machine can pave a 12-foot-wide strip of road during each pass. The machine paves 13 lineal feet of 12-foot-wide road per minute. Two lifts of asphalt are needed to pave the road. After completing a pass, it takes the crew 15 minutes to turn the paving machine around and get ready for the next
pass. The crew consists of a foreperson, seven operators, and a laborer. Using a system efficiency of 45 minutes per hour, determine the number of labor hours required to place 1 lineal foot of road 12 feet wide. What will be an ideal response?
If a trench is 8 feet (2.4 meters) deep, the front outrigger of a wheeled crane should be placed at least _____.
a. 8 feet (2.4 meters) away from the edge b. 12 feet (3.6 meters) away from the edge c. 20 feet (6.1 meters) away from the edge d. 24 feet (7.3 meters) away from the edge
Where does the large Madagascar gecko obtain water?
A) the leaves of plants B) puddles C) fast moving streams D) still or slow moving streams
Documenting all the work performed:
A) Helps to generate the bill. B) Keeps the customer informed. C) Protects you legally. D) Is required by law.