Actual ____________ is the actual time worked on a task; it is based on scheduled duration and remaining work calculated as (Duration * % Complete); or the value can be entered by you.
A. slack
B. time
C. work
D. duration
Answer: D
You might also like to view...
When a(n) ____________ variable is declared, the compiler sets aside, or allocates, a chunk of memory big enough to hold the variable’s data.
a. reference type b. uninitialized c. value type d. dynamic type
The Task Manager's Applications tab reports the name and status for each app, background process, and Windows process that is open and running.
Answer the following statement true (T) or false (F)
The average number of hours before a device is likely to fail is called the
A) MTBF Mean Time Between Failures B) DFR Documented Failure Rate C) EFR Expected Failure Rate D) AFR Average Failure Rate E) None of these describe this feature.
A(n) _____________________ is a disk medium that contains software images to reinstall, repair or restore an operating system on a PC's hard drive to its original operational state.
Fill in the blank(s) with the appropriate word(s).