By continually monitoring and adjusting the processes as needed, a contractor can ensure that the quality of the HMA is maintained from the selection of the raw aggregates until _____.


a. testing is done on the delivered product
b. the completion of the finished pavement
c. binders and adhesives are applied
d. the paving operation is about to begin


b. the completion of the finished pavement

Trades & Technology

You might also like to view...

Why do taxonomists follow an international set of rules when identifying and

classifying plants? What would be the possible consequences of not following these rules?

What will be an ideal response?

Trades & Technology

The information needed to identify lines and other symbols on a construction drawing can be found in the _____

A) title block B) index C) scale D) legend

Trades & Technology

Typical? journal-to-bearing clearance is _______

A) 0.020 to 0.035 inch B) 0.00015 to 0.00018 inch C) 0.0005 to 0.0025 inch D) 0.150 to 0.250 inch

Trades & Technology

Explain the difference between a decorator's bow and a pinch bow. When would

use choose one over the other when decorating an arrangement?

What will be an ideal response?

Trades & Technology