The crossfeed setover amount on a surface grinder for roughing should be about:

A) 20 IPR B) 1/3 the width of the wheel face
C) 20 IPM D) 1/4 in. per stroke


B

Trades & Technology

You might also like to view...

What are the different characteristics of a sire breed and a mother breed?

What will be an ideal response?

Trades & Technology

A concrete monument in the shape of a regular pyramid with a square base weighs 12,800 pounds.  The monument is 6.50 feet high.  Compute the length of a base side rounded to 3 significant digits.  Concrete weighs 137 pounds per cubic foot.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Which of these results of a stall test would indicate a problem of poor engine performance rather than a transmission problem?

A. 150 rpm above specification B. 150 rpm below specification C. 30% below specification D. 30% above specification

Trades & Technology

Multiply the following numbers to obtain the correct product:5,199 x 2,999 =

What will be an ideal response?

Trades & Technology