In the standard-set method of stone installation, each stone slab is provided with two dead load support anchors mid-height of the slab and two tieback anchors each at top and bottom of the slab. What is the shape of dead load anchors and tieback anchors?
What will be an ideal response?
J-shaped dead load anchors and split-tail tieback anchors.
Trades & Technology
You might also like to view...
The over fire draft of an oil furnace is regulated by
A) The forced draft blower B) The barometric damper C) The speed of the oil burner motor D) Matching the nozzle size to the draft capacity of the vent
Trades & Technology
Peak performance is essential to organizations that operate in a globally competitive environment.
The Cat Fanciers' Association recognizes how many pedigreed breeds of cats?
A. 12 B. 27 C. 30 D. 41
Trades & Technology
The desired water flow through a condenser connected to a recirculating water system is 3 gallons per minute.
Answer the following statement true (T) or false (F)
Trades & Technology