The center hose on a two-valve manifold is color-coded __________.  List the four pieces of equipment to which this hose can be connected.

What will be an ideal response?


yellow
a vacuum pump for system evacuation, a nitrogen tank for leak-checking the system, a refrigerant tank for system charging, a recovery unit or recovery tank for refrigerant recovery

Trades & Technology

You might also like to view...

In a simple circuit, a 3.3 k? resistor is placed across a 12-V source. Current through the resistor is

A) 3.64 mA B) 3.64 A C) 36 mA D) 7.27 mA

Trades & Technology

For bison, handling facilities and equipment must be made of more heavy duty materials than those used for cattle.

Answer the following statement true (T) or false (F)

Trades & Technology

ASE-Style Multiple Choice While having a discussion, Technician A says that lead body filler was designed for use on older, thicker, mild steel body panels. Technician B says that it should not be used on modern thin gauge, high-strength steel body panels because the heat can cause panel warpage. Who is correct?

A. A only B. B only C. Both A and B D. Neither A nor B

Trades & Technology

In an OBD II system mode 6 is:

A. The monitoring of test results for continuously monitored systems B. The on-board test of non-continuous monitored systems C. Request for control of on-board system test or component D. The oxygen sensor monitoring test

Trades & Technology