What is a measure of efficiency?
A. Technician flat rate hours earned compared to how long the job took
B. Time tickets that track each of the technician jobs, flat rate hours earned on each job, and
clock hours it took to actually complete each job
C. Both A and B are correct
D. Neither A nor B are correct
C. Both A and B are correct
You might also like to view...
A synchronous motor should never be started with excitation applied to the rotor.
Answer the following statement true (T) or false (F)
List three factors that influence selecting the drawing scale.
What will be an ideal response?
Shipping is an important phase in the heavy construction industry and sometimes involves the drafter. Briefly discuss a type of drafter's sketch and how it can be applied in the shipping phase.
What will be an ideal response?
What instrument is used for measuring leakage rates in a building?
A) A blower door B) Either a blower door or a duct blaster C) A duct blaster D) Leakage rates cannot be directly measured.