Before beginning a roofing project, potential safety problems should be identified by completing a _____
a. safety inspection sheet
b. hazard warning form
c. job hazard analysis
d. OSHA checklist
c
You might also like to view...
Whenever the passenger-side front-seat retaining bolts are loosened, the seat is removed from the vehicle, the seat is replaced, the seat trim is replaced, a sensor is replaced, or the OCM is replaced, an OCS ____ must be performed.
A. reinstallation B. service kit installation C. validation test D. belt tension test
Los requisitos de OSHA rela- cionados con el apuntala- miento y reapuntalamiento están detallados en el apar- tado 29 del CFR, Subparte Q, _____.
a. 1926.310 b. 1926.503 c. 1926.604 d. 1926.703
What type of specialty valve is normally a very small stop valve?
A. diaphragm B. solenoid C. tempering D. relief
Which of the following is used on root pass aluminum welds?
A) Extended land B) Back purging C) Consumable inserts D) All of the above