Before beginning a roofing project, potential safety problems should be identified by completing a _____

a. safety inspection sheet
b. hazard warning form
c. job hazard analysis
d. OSHA checklist


c

Trades & Technology

You might also like to view...

Whenever the passenger-side front-seat retaining bolts are loosened, the seat is removed from the vehicle, the seat is replaced, the seat trim is replaced, a sensor is replaced, or the OCM is replaced, an OCS ____ must be performed.

A. reinstallation B. service kit installation C. validation test D. belt tension test

Trades & Technology

Los requisitos de OSHA rela- cionados con el apuntala- miento y reapuntalamiento están detallados en el apar- tado 29 del CFR, Subparte Q, _____.

a. 1926.310 b. 1926.503 c. 1926.604 d. 1926.703

Trades & Technology

What type of specialty valve is normally a very small stop valve?

A. diaphragm B. solenoid C. tempering D. relief

Trades & Technology

Which of the following is used on root pass aluminum welds?

A) Extended land B) Back purging C) Consumable inserts D) All of the above