A major difference between the drawings for a project and the specifications for the project are that the specs are ____________________
Fill in the blank(s) with correct word
written
You might also like to view...
From which layer of the OSI model does Transfer Control Protocol (TCP) operate?
A. The physical layer B. The frame layer C. The transport layer D. The application/process layer
Evaluating a project and compiling a list of lessons learned is part of a _____ meeting.
a. turnover b. bid review c. full team d. post-project