Hardware and hardware finish are often included in a(n) _____

a. finish listing
b. hardware schedule
c. accessory table
d. door schedule


d

Trades & Technology

You might also like to view...

One million grams equals one ____________________ or a metric ton

Fill in the blank(s) with correct word

Trades & Technology

Which of the following is NOT a problem created by modern drainage systems?

a. River flooding b. Ponding c. Degraded water quality

Trades & Technology

Even when the new project is of a different type or size from the contractor's previous projects, an approximate schedule in the form of a bar chart of the major activities can often still be drafted.

Answer the following statement true (T) or false (F)

Trades & Technology

If a scale ruler is marked 1/8" = 1'0", what is the actual length of a pipeline if it measures 2 3/4" on the drawing?

What will be an ideal response?

Trades & Technology