This is produced when the cutting plane is parallel to the short axis of the structure, and is often referred to as a cross section:

A. detail section
B. full section
C. longitudinal section
D. partial section
E. traverse section


Answer: E

Trades & Technology

You might also like to view...

Which of the following is a required qualification for a signal person, per 29 CFR 1926.1428?

a. A minimum of two years of craft experience b. A minimum of one year experience as a crane operator c. The successful completion of either a written or oral test, and a practical test d. The successful completion of a written test or a practical test (but not both)

Trades & Technology

What would be the benefit of using Early Neutral Evaluations to help settle construction disputes?

What will be an ideal response?

Trades & Technology

When work is completed under the original estimate, the major problem is _____

a. material costs are not accurate b. poor historical data c. bids are not competitive d. profits are limited

Trades & Technology

OSHA is not required to post materials but is required to communicate orally about safety and health issues that concern employees.