What does a surety check out before providing a bond to a contractor?
What will be an ideal response?
Before issuing bonds sureties thoroughly review construction firms and their character, capital, and capacity. Sureties also review the plans and specifications for potential projects and other accomplishments of construction firms.
You might also like to view...
The number of times water can travel completely through a cooling tower cooling system before blowdown is necessary is known as its _______________
A. hydrodynamic projection B. hardness resistance C. cycles of concentration D. zeolite level
Why should refrigerant lines or condensate plumbing be installed in a chase or conduit if they are to be under a poured concrete slab?
What will be an ideal response?
As the air/fuel ratio becomes leaner, the higher the NOX emissions will be until what point?
What will be an ideal response?
A shipper wishing to reduce transportation costs will:
A) use trucks for all his shipments. B) ship to LTL lots. C) ship only in small quantities. D) all of the above E) none of the above