In order for a switch to operate, power is available from the following sources in which order of operation and backup?
A) electric company, battery, diesel or gas-fed generator
B) diesel or gas-fed generator, electric company, battery
C) electric company, diesel or gas-fed generator, battery
D) battery, electric company, diesel or gas-fed generator
A
You might also like to view...
Bimetal strip-type overload relays generally permit the trip current to be adjusted to between 85% and ____% of the heater rating.
A. 95 B. 105 C. 115 D. 125
A PV panel is putting out 108 w/hr of electrical power one day. Convert this to w/s.
Fill in the blank(s) with the appropriate word(s).
The coastal region of the western United States lies in
A) climate zone 3(A). B) climate zone 2(A). C) climate zone 1(A). D) climate zone 4(A). E) none of the above.
Identify and explain the system for identifying levels of crash severity as used in the Highway Safety Manual.
What will be an ideal response?