Answer the following statement(s) true (T) or false (F)

1. The type of three-phase service is determined by the type of secondary transformer connection supplied by the power company.
2. Fuses are connected in series with the load
3. Many circuit breaker panels are designed to employ half-size circuit breakers.
4. The fall-of-potential test requires the use of a ground resistance meter.
5.The clamp-on ground resistance test has several advantages over the three-point fall-of-potential test.


1. TRUE
2. TRUE
3. TRUE
4. TRUE
5.TRUE

Trades & Technology

You might also like to view...

Describe air and its composition

What will be an ideal response?

Trades & Technology

Abuse, design deficiencies, material problems, and wear are the four basic causes of machine _____

A) vibration B) overheating C) noise D) failure

Trades & Technology

Most modern PLCs can connect to building networks using _____

A) RS-422 B) serial protocols C) Ethernet D) RS-485

Trades & Technology

The subsequent problems deal with the following gray code to binary code conversion equations where the subscript 3 represents the MSB:B3 = G3B2 = B3 ? G2B1 = B2 ? G1B0 = B1 ? G0What gray code would correspond to the binary code 1010?

A. 0101 B. 1011 C. 0111 D. 1100 E. 1111

Trades & Technology