Solve the problem.Find the length of each side of the triangle determined by the three points P1, P2, and P3. State whether the triangle is an isosceles triangle, a right triangle, neither of these, or both.P1 = (-5, -4), P2 = (-3, 4), P3 = (0, -1)
A. d(P1, P2) = 2; d(P2, P3) =
; d(P1, P3) = 5
neither
B. d(P1, P2) = 2; d(P2, P3) =
; d(P1, P3) = 5
right triangle
C. d(P1, P2) = 2; d(P2, P3) =
; d(P1, P3) =
both
D. d(P1, P2) = 2; d(P2, P3) =
; d(P1, P3) =
isosceles triangle
Answer: C
You might also like to view...
Provide an appropriate response.Shareholder ratios translate the overall results of business operations so that they can be compared in terms of a share of stock.
A. True B. False
Provide an appropriate response.Suppose that you are solving a system of three linear equations and have evaluated D, Dx, Dy, and Dz. Under what condition does Cramer's rule not apply?
A. D = 0, and either Dx = 0, Dy = 0, or Dz = 0 B. Dx = 0 C. Dx = 0, Dy = 0, or Dz = 0 D. D = 0
Match the numerical model to the corresponding model.
A. y = x + 60 B. y = 60-2x C. y = 60-2x2 D. y = 60-x2
Nolan Industries manufactures water filters/purifiers that attach to a kitchen faucet. Each purifier consists of a housing unit that attaches to the faucet and a 60-day filter that is inserted into the housing. Past records indicate that on average the number of filters produced plus the number of housing units produced should be at least 500 per week. It takes 20 minutes to make and assemble each filter and 40 minutes for each housing. The manufacturing facility has up to 20,000 minutes per week for making and assembling these units, but due to certain parts' supply constraints, the number of housing units per week can be at most 400. If manufacturing costs (for material and labor) are $7.25 for each filter and $8.55 for each housing unit, how many of each should be produced to
minimize weekly costs? Find the minimum cost. ? A. Minimum cost of $3,206.25 weekly when no filtres and 375 housing units are produced. B. Minimum cost of $3,587.50 weekly when 200 filtres and 250 housing units are produced. C. Minimum cost of $2,978.75 weekly when 175 filtres and 200 housing units are produced. D. Minimum cost of $3,160.00 weekly when 200 filtres and 200 housing units are produced. E. Minimum cost of $3,625.00 weekly when 500 filtres and no housing units are produced.