Hank had 10 billable flat rate hours and he took 9 clock hours to do the work. He ________

A. Took 1 hour less time than expected
B. Took 1 hour more than expected
C. Was effective
D. Was not efficient


A. Took 1 hour less time than expected

Trades & Technology

You might also like to view...

In a current direct injected diesel engine governed at 2000 rpm, what droplet size range must the injection system produce?

A. 1 - 10 microns B. 10 - 100 microns C. 100 - 200 microns D. 200 - 500 microns

Trades & Technology

List the factors that minimize the hazards associated with excavation work

What will be an ideal response?

Trades & Technology

An 8-foot tall vertical stack of firewood casts a 12-foot shadow on horizontal ground. What is the angle of the sun in the horizon?

a. 8° b. 12° c. 45° d. 34°

Trades & Technology

What should be done to treat frostbite to the skin?

What will be an ideal response?

Trades & Technology